Abstract : duri ng concrete deep well constructi on , because of thediffi culti es i n engi neeri ng geographi cal conditi ons , the ordi nary bilateral hydrauli c sli di ng formwork technology can not be adopted . therefore , an unilateral sli di ng formwork technology lifted by chai n block method can beappli ed to advantage and better solved the proble m 文摘:在混凝土深井施工中,由于受地理環(huán)境的限制,不能內(nèi)外安裝模板時,難以應(yīng)用一般的液壓滑模施工技術(shù),而采用單面模板、鏈條葫蘆提升滑模工藝,可較好地解決這一問題。
Aiming at the popularization and application of the new - typed scaffold and frame together with the problems of the general concern , the author expounds 8 suggestions . for example , the use of the plywood formwork and the steel - lined formwork should be the developmental direction of the formwork technology of our country ; the development of the high quality plywood formwork and the adoption of the low - alloyed steel tube scaffold will substitute usual ones ; the supervision and the management of the new production must be strengthened gradually , etc 針對我國新型模板和腳手架推廣應(yīng)用過程中,大家關(guān)心的問題,闡明了膠合板模板和鋼框膠合板模板應(yīng)是模板技術(shù)的發(fā)展方向、開發(fā)高質(zhì)量的竹膠合板模板、采用低合金鋼管腳手架逐步取代普碳鋼管勢在必行及加強產(chǎn)品質(zhì)量監(jiān)督和管理等8點意見。